ROIDA IRON ORE MINE
Mesco Steel is operating Roida Iron Ore Mine, at Barbil well connected with railways and highways on an area of 104 hectares
- High grade Iron Ore (Iron Content of 63%) with annual production 3 million tons and Reserves of 200 million tons
- Products
- 10-30 mm Calibrated Lump Ore (Iron Content 60-62%)
- 5-18 mm Calibrated Lump Ore (Iron Content 60-62%)
- Blue Dust (Over 63% Iron Content)
- Fines (Iron Content 56-63%)